Solid Waste Management
Waste management consultants handling bulk waste generator registration, CPCB portal filings, and the annual returns that keep manufacturing units compliant under the SWM Rules, 2016.
Overview
The Solid Waste Management Rules, 2016 apply to any establishment generating non-hazardous solid waste, which covers the ordinary packaging, canteen, and general refuse every manufacturing unit produces alongside its process waste. A unit generating waste above the bulk-generator threshold set by the local authority has to register as a bulk generator, segregate waste at source into wet, dry, and other categories, and route it through authorized collectors or recyclers rather than municipal disposal. This runs separately from the Hazardous and Other Wastes Rules, which cover process-related hazardous waste and are handled under PCB Compliance.
Saanvi Advisory files the bulk generator registration, manages the CPCB portal filings it requires, and keeps annual returns current. This typically runs alongside the unit's PCB consent work, since both pass through the same pollution control board relationship and the same site inspection.
What's Included
- Bulk Waste Generator Registration. Registering the unit with the local authority or State Pollution Control Board once generation crosses the applicable threshold.
- Waste Segregation & Storage Compliance. Source segregation into wet, dry, and other categories, with on-site storage arrangements that meet Rule requirements.
- CPCB Portal Filings. The Central Pollution Control Board portal filings bulk generators are required to submit.
- Annual Returns. Documentation of waste generated, treated, and disposed of, filed annually with the prescribed authority.
- Authorized Vendor Documentation. Transfer records and manifests for waste handed off to registered collectors or recyclers.
- Renewal & Ongoing Compliance. Tracking renewal cycles and keeping filings current as production volumes and waste categories change.
Engagement Process
Waste Audit & Threshold Check
Site assessment identifying waste streams and whether bulk-generator registration applies.
Registration & Authorization Filing
Application filed with the relevant local authority or State Pollution Control Board.
Systems & Documentation Setup
Segregation, on-site storage, and record-keeping systems put in place and tied to authorized vendors.
Annual Returns & Renewal
Ongoing annual filing, with renewal tracked ahead of its due date.
Who This Is For
Manufacturing units anywhere in India generating solid waste above the bulk-generator threshold, needing registration, authorization, or ongoing Solid Waste Management Rules, 2016 compliance. Saanvi Advisory currently handles this directly, typically alongside PCB Compliance work for the same site.
Anticipating a Compliance Requirement?
Submit an enquiry outlining your requirement, and our team will respond with the relevant scope of assistance. No obligation.
Send an Enquiry